Project Overview
Road resurfacing coordinated with stormwater infiltration and storage improvements.
Why is this work being done?
- Chapin and Third watermain replacement prompted road surface and storm system updates; coordination will save time and money.
- Maximizing stormwater infiltration and storage capacity within the Allen Creek watershed will mitigate first-flush contamination runoff.
- The road is in very poor condition.
Work to be done
- Remove excess groundwater.
- Replace aging watermain.
- Replace utility structures and covers as needed within the road influence.
- Resurface road.
Safety improvements will be implemented along the corridor that align with the city’s Vision Zero Transportation Plan for all ages and abilities routes.
Costs and funding sources
- Water main work will be paid for by the Water Supply System Fund.
- Stormwater system improvement will be paid for by the Stormwater Fund.
- Repaving will be funded by the Road, Bridge, and Sidewalk Millage Fund.
Additional information regarding water utilities, road resurfacing, and street selection can be accessed under the Links & Resources side menu.
- The streets will be closed to through traffic during construction. Residential access will be maintained but may include delays during working hours. Cross street traffic will be maintained as much as possible.
- Water main breaks happen during construction; these are not planned therefore notifications are not possible. The breaks will be repaired, and water service will be restored as soon as possible.
- Water service will be interrupted for short durations during water main installation. Planned disruptions will be limited, and residents will be informed in advance.
- Mail and delivery services, as well as garbage, compost, and recycling pick up will not be affected.
- The project limits are within the City Right-of-Way which extends from the center of the road to 1 foot behind the back of the sidewalk on both sides of the road. The contractor will be allowed to store materials and equipment in this area (outside of tree canopies). Any disturbed area will be restored with grass seed after the project.
- The excavated area will be generally limited to the road, however, some curb is planned to be removed and replaced which will disturb the area 1-2 feet behind the curb. Any private utilities, i.e. sprinkler systems within the City’s Right-of-Way, are the responsibility of the homeowner and may not be repaired if damaged during the project.
- Relocation and the addition of new fire hydrants may change or eliminate some on-street parking along the streets.
- General noise and dust from equipment, particularly during site excavation.
- Construction notifications, with an estimated schedule, will be delivered prior to construction.
August 6, 2026 Update
Crew will begin soil boring along Chapin Street next week, beginning Monday, August 10. This work is necessary for the preliminary design process.
Should you have questions, please contact me.
Thank you.
Tracy Anderson, Project Manager
July 2026 Update
Project kickoff and internal coordination. More to come!
Project Boundary
Project boundary - public right of way from Chapin and Miller, across Huron, to Third and Washington.