Project Overview
plan is for the construction of the following:
- a fully electric,
- 10-story mixed-use development
- 280 units,
- a coffee shop, retail, and amenity spaces on the ground floor with access from First St.
The ground floor is mostly comprised of covered parking, including electric vehicle charging, with access from W. Washington St. The first floor will have additional covered parking. Floors 1-10 will contain a mixture of studio, one and two bedrooms, with 15% of the units being 60% area median income affordable housing. The project also plans to include various sustainability features.
The site is partially located in a floodplain fringe and zoned D2 Downtown Interface, First Street Overlay District, Secondary Street Designation, and is in Ward 5.
July 8, 2025: The Citizen Participation meeting was held. To review the meeting minutes, go to stream.a2gov.org and search SP25-0014 and scroll to the pdf titled "Community Participation Report."